Renovating a flat in Mallorca: price per square metre

A partial renovation runs between four hundred and seven hundred euros a square metre, a full renovation between seven hundred and eleven hundred, and a full renovation to a high specification can exceed fourteen hundred euros a square metre.

gelisted editorial team · Updated 15 August 2026

The short version

  • Full renovation starts at about 700 € a square metre.
  • Bathrooms and kitchen take 40 to 55 per cent of the budget.
  • A full renovation of 90 square metres takes 3 to 5 months.
  • Shipping materials to the island adds 5 to 15 per cent to supply costs.

A price per square metre is useful for orientation and useless for contracting. What decides the invoice is what gets touched and how it is finished.

The three levels

A partial renovation updates without touching services: paint, floors, joinery, replacement sanitaryware. A full renovation includes demolition, new electrical and plumbing installations, redistribution, and complete kitchen and bathrooms. A high specification renovation adds bespoke joinery, more expensive materials, ducted climate control and a design project with site supervision.

Level€ per m²Home of 90 m²
Light refresh300 to 450 €27,000 to 40,500 €
Partial renovation400 to 700 €36,000 to 63,000 €
Full renovation700 to 1,100 €63,000 to 99,000 €
High specification1,100 to 1,600 €99,000 to 144,000 €
Complete bathroomper unit5,000 to 12,000 €
Complete kitchenper unit8,000 to 25,000 €
Design fees6 to 12 % of works
Indicative price by level and floor area.

Where the money goes

Bathrooms and kitchen absorb 40 to 55 per cent of a full renovation budget, because they concentrate services, waterproofing, tiling and equipment into a few square metres. Complete electrical and plumbing installations take another 15 to 20 per cent. And bespoke joinery, which sounds like a detail, can account for 8,000 € to 25,000 € in an average home.

What makes it dearer here

Shipping materials, which adds 5 to 15 per cent to supply lines. Seasonality, since demand for trades rises in the high season and lead times stretch. And access in old town centres: narrow streets with no room for a skip at the door force manual carrying that can add 2,000 € to 6,000 € to an average project.

Contracting between October and February usually improves both price and programme against the May to September window.

Realistic timescales

A partial renovation of 90 square metres takes 5 to 10 weeks. A full one takes 3 to 5 months on site, plus 4 to 10 weeks beforehand for design, licence and ordering. Bespoke joinery and certain materials carry lead times of 6 to 14 weeks that must be ordered at the outset. A programme that ignores those supply times will not be met, however good the team.

Frequently asked

+What does it cost to renovate a flat?

Four hundred to seven hundred euros a square metre partially, and 700 € to 1,100 € for a full renovation.

+Which items take most of the budget?

Bathrooms and kitchen at 40 to 55 per cent, followed by the electrical and plumbing installations.

+How long does a full renovation take?

Three to five months on site for 90 square metres, plus 4 to 10 weeks of design and ordering.

+Why is it more expensive on the island?

Shipping adds 5 to 15 per cent to materials, and access in old town centres adds manual handling.

+When is the best time to contract?

Between October and February, when demand for trades falls and both price and programme improve.